BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20250304T220000Z
DTEND:20250305T010000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:2025 Monthly Membership Meeting
DESCRIPTION:TOPIC: Cape Cod Bridges Update\n\n \n\nSPEAKERS: \n\n\n	Luisa Paiewonsky\, MassDOT's Director of Mega-Projects\n	Dan Wolf\, Co-Chair of Cape & Islands Bridges Coalition\n	Kristy Senatori\, Cape Cod Commission\n	Mike Jackman\, Congressman Keating's office\n\n\nSponsored by: KAM Appliances\n \n\nThe Bourne and Sagamore Bridges are the only financially viable way for employees and supplies to come on and off Cape Cod and as such\, are vital infrastructure for the home building and remodeling industry on Cape Cod.\n \n\nAs a man-made island connected by two roadways and a rail line\, Cape Cod's economic future hinges on transportation access to and from the mainland. Two 88-year-old bridges\, the Sagamore and the Bourne\, currently provide the only vehicle access points for Cape Cod's 230\,000 year-round residents\, more than 8\,500 businesses\, and 5 million annual visitors. When these two bridges were built in 1935\, they collectively saw fewer than 1 million annual crossings. Today\, traffic on the bridges exceeds 38 million crossings per year\, roughly equivalent to the Golden Gate Bridge.\n\n \n\nIn recent years\, both the Sagamore and Bourne Bridges have required increasingly frequent maintenance\, resulting in both community and business impacts. The bridges are approaching the end of their serviceable lifespan and are considered functionally obsolete and structurally deficient. If not replaced\, the bridges will soon require major rehabilitation work\, leading to months-long lane restrictions and bridge closures. A complete closure of either bridge would result in an unprecedented disruption to the regional economy.\n\n \n\nMembers will learn the plan and status of funding for each bridge from key experts on the topic.
X-ALT-DESC;FMTTYPE=text/html:<p style="margin: 0px\; padding: 0px\; color: rgb(70\, 70\, 70)\; font-family: Roboto\, sans-serif\; font-size: 16px\; white-space-collapse: preserve\;"><span style="color: rgb(1\, 139\, 85)\; font-family: Arial\, Verdana\, Helvetica\, sans-serif\; font-weight: bold\;">TOPIC: Cape Cod Bridges Update</span></p>\n\n<p style="margin: 0px\; padding: 0px\; color: rgb(70\, 70\, 70)\; font-family: Roboto\, sans-serif\; font-size: 16px\; white-space-collapse: preserve\;"><span style="color: rgb(1\, 139\, 85)\; font-family: Arial\, Verdana\, Helvetica\, sans-serif\; font-weight: bold\;">&#65279\;</span></p>\n\n<p style="margin: 0px\; padding: 0px\; color: rgb(70\, 70\, 70)\; font-family: Roboto\, sans-serif\; font-size: 16px\; white-space-collapse: preserve\;"><span style="color: rgb(1\, 139\, 85)\; font-family: Arial\, Verdana\, Helvetica\, sans-serif\; font-weight: bold\;">SPEAKERS: </span></p>\n\n<ul>\n	<li style="padding: 0px\; margin: 0px\; color: rgb(1\, 139\, 85)\;">Luisa Paiewonsky\, MassDOT&rsquo\;s Director of Mega-Projects</li>\n	<li style="padding: 0px\; margin: 0px\; color: rgb(1\, 139\, 85)\;">Dan Wolf\, Co-Chair of Cape &amp\; Islands Bridges Coalition</li>\n	<li style="padding: 0px\; margin: 0px\; color: rgb(1\, 139\, 85)\;">Kristy Senatori\, Cape Cod Commission</li>\n	<li style="padding: 0px\; margin: 0px\; color: rgb(1\, 139\, 85)\;">Mike Jackman\, Congressman Keating&#39\;s office</li>\n</ul>\n\n<p style="margin: 0px\; padding: 0px\; color: rgb(70\, 70\, 70)\; font-family: Roboto\, sans-serif\; font-size: 16px\; white-space-collapse: preserve\;"><strong><span style="color: rgb(1\, 139\, 85)\;">Sponsored by: <a href="https://www.kamappliances.com/">KAM Appliances</a></span></strong></p>\n&nbsp\;\n\n<p dir="ltr" style="line-height:1.2\;margin-top:0pt\;margin-bottom:0pt\;"><span id="docs-internal-guid-4c62a3c6-7fff-cfaa-e388-77c74a4e84c6"><span style="font-size: 11pt\; font-family: Aptos\; color: rgb(0\, 0\, 0)\; background-color: transparent\; font-variant-numeric: normal\; font-variant-east-asian: normal\; font-variant-alternates: normal\; font-variant-position: normal\; font-variant-emoji: normal\; vertical-align: baseline\; white-space-collapse: preserve\;">The Bourne and Sagamore Bridges are the only financially viable way for employees and supplies to come on and off Cape Cod and as such\, are vital infrastructure for the home building and remodeling industry on Cape Cod.</span></span></p>\n&nbsp\;\n\n<p dir="ltr" style="line-height:1.2\;margin-top:0pt\;margin-bottom:0pt\;"><span id="docs-internal-guid-4c62a3c6-7fff-cfaa-e388-77c74a4e84c6"><span style="font-size: 11pt\; font-family: Aptos\; color: rgb(0\, 0\, 0)\; background-color: transparent\; font-variant-numeric: normal\; font-variant-east-asian: normal\; font-variant-alternates: normal\; font-variant-position: normal\; font-variant-emoji: normal\; vertical-align: baseline\; white-space-collapse: preserve\;">As a man-made island connected by two roadways and a rail line\, Cape Cod&#39\;s economic future hinges on transportation access to and from the mainland. Two 88-year-old bridges\, the Sagamore and the Bourne\, currently provide the only vehicle access points for Cape Cod&#39\;s 230\,000 year-round residents\, more than 8\,500 businesses\, and 5 million annual visitors. When these two bridges were built in 1935\, they collectively saw fewer than 1 million annual crossings. Today\, traffic on the bridges exceeds 38 million crossings per year\, roughly equivalent to the Golden Gate Bridge.</span></span></p>\n\n<p dir="ltr" style="line-height:1.2\;margin-top:0pt\;margin-bottom:0pt\;"><span id="docs-internal-guid-4c62a3c6-7fff-cfaa-e388-77c74a4e84c6"><span style="font-size: 11pt\; font-family: Aptos\; color: rgb(0\, 0\, 0)\; background-color: transparent\; font-variant-numeric: normal\; font-variant-east-asian: normal\; font-variant-alternates: normal\; font-variant-position: normal\; font-variant-emoji: normal\; vertical-align: baseline\; white-space-collapse: preserve\;">&nbsp\;</span></span></p>\n\n<p dir="ltr" style="line-height:1.2\;margin-top:0pt\;margin-bottom:0pt\;"><span id="docs-internal-guid-4c62a3c6-7fff-cfaa-e388-77c74a4e84c6"><span style="font-size: 11pt\; font-family: Aptos\; color: rgb(0\, 0\, 0)\; background-color: transparent\; font-variant-numeric: normal\; font-variant-east-asian: normal\; font-variant-alternates: normal\; font-variant-position: normal\; font-variant-emoji: normal\; vertical-align: baseline\; white-space-collapse: preserve\;">In recent years\, both the Sagamore and Bourne Bridges have required increasingly frequent maintenance\, resulting in both community and business impacts. The bridges are approaching the end of their serviceable lifespan and are considered functionally obsolete and structurally deficient. If not replaced\, the bridges will soon require major rehabilitation work\, leading to months-long lane restrictions and bridge closures. A complete closure of either bridge would result in an unprecedented disruption to the regional economy.</span></span></p>\n\n<p dir="ltr" style="line-height:1.2\;margin-top:0pt\;margin-bottom:0pt\;"><span id="docs-internal-guid-4c62a3c6-7fff-cfaa-e388-77c74a4e84c6"><span style="font-size: 11pt\; font-family: Aptos\; color: rgb(0\, 0\, 0)\; background-color: transparent\; font-variant-numeric: normal\; font-variant-east-asian: normal\; font-variant-alternates: normal\; font-variant-position: normal\; font-variant-emoji: normal\; vertical-align: baseline\; white-space-collapse: preserve\;">&nbsp\;</span></span></p>\n\n<p dir="ltr" style="line-height:1.2\;margin-top:0pt\;margin-bottom:0pt\;"><span id="docs-internal-guid-4c62a3c6-7fff-cfaa-e388-77c74a4e84c6"><span style="font-size: 11pt\; font-family: Aptos\; color: rgb(0\, 0\, 0)\; background-color: transparent\; font-variant-numeric: normal\; font-variant-east-asian: normal\; font-variant-alternates: normal\; font-variant-position: normal\; font-variant-emoji: normal\; vertical-align: baseline\; white-space-collapse: preserve\;">Members will learn the plan and status of funding for each bridge from key experts on the topic.&nbsp\;</span></span></p>\n\n<p dir="ltr" style="line-height:1.2\;margin-top:0pt\;margin-bottom:0pt\;">&nbsp\;</p>\n
LOCATION:DoubleTree Hyannis 287 Iyannough Road Hyannis\, MA 02601
UID:e.9253.1560
SEQUENCE:3
DTSTAMP:20261002T160236Z
URL:https://members.capecodbuilders.org/events/details/2025-monthly-membership-meeting-1560
END:VEVENT

END:VCALENDAR
